You can configure the slots ahead of time, make sure you use the correct switch model.
Once you can configure the slot you can can configure the ports. This way when you physically install the switches you would just complete the switch swap procedure as if you were replacing a failed node.
I don't have the commands in front of me but...
configure slot
or
configure stacking slot
and a couple tabs should get you there.