ExtremeSwitching (EXOS)

  • 1.  GRE Tunnel Error

    Posted 12-09-2016 09:14
    when i configuration Gre Tunnel, it show Erorr there (Error: Stack slot 1 must be removed before GRE tunnels can be configured. Configuration failed on backup Node, command execution aborted!).


  • 2.  RE: GRE Tunnel Error

    Posted 12-09-2016 09:23
    What is the slot 1 in your stack ? can you please give the "show slot" output



  • 3.  RE: GRE Tunnel Error

    Posted 12-09-2016 09:23
    The Slot 1 is a Extreme Switch X620-16x and Slot 2 is other Switch X620-16x, I configured stacking for two Switch by port 15 and 16

    Slot 1-stack#create tunnel tunnel6 gre destination 172.22.0.11 source 172.22.136.3
    Error: Stack slot 1 must be removed before GRE tunnels can be configured. Configuration failed on backup Node, command execution aborted!


  • 4.  RE: GRE Tunnel Error

    Posted 12-10-2016 02:16
    pls help me...



  • 5.  RE: GRE Tunnel Error

    Posted 12-10-2016 08:52
    HI,

    As per the license requirements, GRE tunneling requires core license installed. X620 devices can be upgraded from standard Edge license to only the Adv Edge license.
    So, we may be hitting the limitation here. Pls refer the screenshots below.





    Please refer the link below about the feature license requirements of 21.1.

    http://documentation.extremenetworks.com/FLR/EXOS_21_1/Feature_License_Requirements/r_overview.shtml

    Hope this helps!


  • 6.  RE: GRE Tunnel Error

    Posted 12-10-2016 08:52
    Thank you, ill check it again


  • 7.  RE: GRE Tunnel Error

    Posted 12-10-2016 08:52
    Hi Luu, These are the platforms which support GRE tunnel.
    X460, X460-G2 X480, X670, X670-G2 and X770.