Enter stack loses VLAN / port assignments after editing port alias

  • 0
  • 1
  • Problem
  • Updated 8 months ago
  • Not a Problem
  • (Edited)
Just tried to make a port change through EMC on an Enterasys C5 switch*, after doing the enforce, lost VLAN port configuration.
Would this be because the edit should have been done through the java Netsight client? Love to get some advice. 

This is a C5G124-48P2 running firmware 06.71.03.0025
Photo of Somebo O'Rother

Somebo O'Rother

  • 120 Points 100 badge 2x thumb
  • grim

Posted 8 months ago

  • 0
  • 1

Be the first to post a reply!