How to transition from a standard uplink between 2 switches to MLAG?

  • 0
  • 1
  • Question
  • Updated 5 months ago
I have 2 x460-G2 switches and are currently uplinked via port 54 on both switches (10G).  I'd like to configure them with MLAG, but have little to no downtime.   

I have core devices and access devices connected to each switch which of course would cause some pain trying to take down link during business hours. 

Suggestions?
Photo of Sean Scarfo

Sean Scarfo

  • 236 Points 100 badge 2x thumb
  • thankful

Posted 5 months ago

  • 0
  • 1

Be the first to post a reply!