Hi everyone.

I do not have much experience with VDX,

Below is my situation:

We have four VDX6740  in logical chasis mode.   Three  have no principal switch priority, we have configured Principal priority  1 on Master switch.  We will be moving to new data center, so my question is if we power down  these switches and then power them up at new data center, will they lose the config?

My second question is there any way  I can gracefully shutdown the switches rather than removing the power?

Appreciated!!
Photo of zeeshan qadir

zeeshan qadir

  • 266 Points 250 badge 2x thumb

Posted 5 months ago

  • 0
  • 1
Photo of Richard Applebee

Richard Applebee

  • 412 Points 250 badge 2x thumb
I have only been playing with these (a pair of VDX 6740T's in logical chassis mode) for the past few days but have learned that removing power without taking prior action will result in loosing their config. Last night I issued "chassis power-cycle-db-shutdown" on each node via console connection before I powered them down. This morning when I powered them back up they had not lost any configuration.
Photo of TechHelp24

TechHelp24

  • 90 Points 75 badge 2x thumb
Hi zeeshan qadir

some command are not visible in NOS and no listed in CLI guide

do follow

TH24_VDX_6740_FAB5_EDGE_A#unhide foscmd

Password:fibranne

TH24_VDX_6740_FAB5_EDGE_A# foscmd poweroff