V2110 - Elastic Appliance, small>large


Userlevel 7
Hi,

how does the migration work.... like this...

- V2110 must run V9.21 to support the feature
- shutdown VM controller
- increase VM resources as per datasheet for a large deployment
- start VM controller

Thanks,
Ron

1 reply

Userlevel 7
Craig@GTAC pointed me to the solution...

"Power down the controller, then bring it back up with allocation of 4 CPUs and 2 GB RAM for Medium scale, or 8 CPUs and 4 GB RAM for Large scale."

https://gtacknowledge.extremenetworks.com/articles/Solution/IdentiFi-Virtual-Controller-accepts-only...

Thanks

Reply