Hello,
I am currently trying to find/test the best solution for the network below:
Switch X670-1,2,3 and 4 are already in use, switch X670-5 and 6 are new.
1,2,3 and 4 are currently connected with MLAG.
X670-1 and 2 are present on one site.
X670-3 and 4 are present on one site.
X670-5 and 6 are present on one (new) site.
I have the above set up in a testlab.
Should i configure EAPS or ERPS for this setup or can is simply use MLAG?
I am afraid i will get loops if I connect the switches like this.
Can anyone give me some tips how i can do this the most effectively.