I have 2
x460-G2 switches and are currently uplinked via port 54 on both switches (10G). I'd like to configure them with MLAG, but have little to no downtime.
I have core devices and access devices connected to each switch which of course would cause some pain trying to take down link during business hours.
Suggestions?