I'm trying to stack two x670v-48x's together using two 80Gb ports on each of the VIM4-40G4X modules.
Questions about stacking are:
- What is the physical connection of the stacking cables between two switches?
Port 1 (SW 1) -> Port 2 (SW 2) | Port 2 (SW 1) -> Port 1 (SW 2)
Port 3 (SW 1) -> Port 4 (SW 2) | Port 4 (SW 1) -> Port 3 (SW 2)
- The redundancy of the physical cable is which way? What cables with cables which are redundant?
With v320 stacking, ports 1 and 3 on the VIM are part of a LAG that the switch sees as stacking port 1, while ports 2 and 4 on the VIM are LAGed together as stacking port 2.
This guide will explain how it is cabled. If you have questions after reading that please let us know. this is probably the fastest way for you to get an answer unless you call GTAC.