I have a stack of 5 X440-48p G2 switches. I want to have a LAG uplink to the network and am wondering if the 2 ports should be on the master and backup? I configured port 1:48 & 5:48 in the LAG but node 5 is just a standby node. Should I fix the LAG so it is ports 1:48 (master) & 2:48 (backup) or does it not matter?
Thanks