Thanks Bruce. I'm not actually sure yet. Tomorrow we're doing an onsite to get an idea of how many students are there at once. We're getting there early in order to gain an understanding of how everything is set up (was done by an old employee with limited documentation). Hoping to get some basics in terms of what to look for (other than the obvious stuff like 500 people trying to hit a single AP ! ). Our intent is to audit which AP's are within the same rough location, determine how much people are bleeding to nearby AP's that might need lower power to control CCI, get a handle on active connections to the units in the actual room and then plan for added AP's, load groups, etc.