Hello, everybody!
I have Netsight 6.3.182 and a lot of Extreme switches with LLDP enabled. I've added them all to the Netsight over SNMP and made a topology map in Oneview. All the links between Summits were drawn and everything is OK.
Two days ago I added few CISCO switches (45xx CATs), made a special profile for them in Netsight and updated IOSes for LLDP support. (I've issued "lldp run" command, for sure).
From Summits after "show lldp neigh" command I see my directly connected CISCOs.
I can add them to the topology map in OneView. But the links between them and Summits don't appear! What do I wrong? Please, explain!
Many thanks in advance,
Ilya