Hi everyone.
I do not have much experience with VDX,
Below is my situation:
We have four VDX6740 in logical chasis mode. Three have no principal switch priority, we have configured Principal priority 1 on Master switch. We will be moving to new data center, so my question is if we power down these switches and then power them up at new data center, will they lose the config?
My second question is there any way I can gracefully shutdown the switches rather than removing the power?
Appreciated!!