Stacking after new image on master.
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Get Direct Link
- Report Inappropriate Content
‎01-07-2014 09:55 PM
Create Date: Sep 18 2012 3:02PM
After I configure the stacking on 5 Summit X440-48p switches, I upgraded the image on the master and rebooted.
Will the image sync with all other nodes?
Do I need to sync manually or enable stacking again. When I look into the images of the other nodes it tell me N/A however when I look into the detail on the node it tells me they are enabled for stacking.
The management light on all the other 4 nodes are blinking orange, does this tell me that they are being updated? Or should I sync?
Edit: Also when i show node detail it tells me FAIL.
Thanks (from Paul_Wanless)
After I configure the stacking on 5 Summit X440-48p switches, I upgraded the image on the master and rebooted.
Will the image sync with all other nodes?
Do I need to sync manually or enable stacking again. When I look into the images of the other nodes it tell me N/A however when I look into the detail on the node it tells me they are enabled for stacking.
The management light on all the other 4 nodes are blinking orange, does this tell me that they are being updated? Or should I sync?
Edit: Also when i show node detail it tells me FAIL.
Thanks (from Paul_Wanless)
5 REPLIES 5
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Get Direct Link
- Report Inappropriate Content
‎01-07-2014 09:55 PM
Create Date: Sep 18 2012 5:32PM
Hey ClassicDWhen you upload the image to the master it will go ahead and download the code to all of the switches. This will not affect traffic even though it may take a few minutes.This is why it is important to not only have the same image on all of the switches but also have them in the same image container as the master as it will download the image into the same container that you placed it on the master.Hope that helps.P (from Paul_Russo)
Hey ClassicDWhen you upload the image to the master it will go ahead and download the code to all of the switches. This will not affect traffic even though it may take a few minutes.This is why it is important to not only have the same image on all of the switches but also have them in the same image container as the master as it will download the image into the same container that you placed it on the master.Hope that helps.P (from Paul_Russo)
