Apologize for bad snapshot had less time.
I have to shift my network from STP to EAPS.
First i am creating two separate EAPS domains for each ring in my network.
Second i want to make my "SWITCHX" also redundant wich is connected to one switch in each ring, for that i have created two Common link shared ports on that switch (Port 10 and 20). SWITCHX is in partner mode in both shared ports for common link.
Switch Ring1-B is in controller mode for its port 20 connected to SWITCHX port 20 for common link with link-id 111
Switch Ring2-B is in controller mode for its port 10 connected to SWITCHX port 10 for common link with link-id 222
Result is loop.
Please help.