Tim_O_Donnell
New Contributor
since ‎09-07-2021
‎08-30-2022

User Statistics

  • 10 Posts
  • 0 Solutions
  • 0 Kudos given
  • 0 Kudos received

User Activity

I have an existing stack with 2 nodes already. I am adding 3 additional switches to the stack. Can I preconfigure the 3 new switches as slots 3-5 before hand or will they need to be done once they are added to the stack as this article points out:htt...
Can a port share then be added to an MLAG? Client wants to have Layer 2 or Layer 3 sharing capabilities and then do a MLAG using those ports or the sharing ports. Is there some way to do this? Currently they have a Stack and are sharing between ...
Extreme Management Center 8.0.2.42 Legacy Console Errors out starting. The User Connection Service is unavailable. Have already restarted the server. This is an appliance so it is running some form of Linux. Need to start this service, but I am n...
GTM-P2G8KFN