Aerohive Migrated Content
Questions and discussions related to old aerohive products migrated over
cancel
Showing results for 
Search instead for 
Did you mean: 

Forum Posts

Installing AP1130's on the exterior of a school and i am worried about grounding them. I see they come with a short grounding cable. Most are piped directly back to a cable tray that is approx.60'. What size ground is needed, how far can it be from t

Installing AP1130's on the exterior of a school and i am worried about grounding them. I see they come with a short grounding cable. Most are piped directly back to a cable tray that is approx.60'. What size ground is needed, how far can it be from t

Hello, I have question about API. I have working script to get AP Status from API GET. My question is about the PLAN. Now I have basic plan which include. What this mean. Am I limited to count of HITS as it is on the Features (1000 hit / day) ?

How to get unlimited access to API with method GET ? I can't see any prices etc. I clicked on REQUEST PLAN CHANGE, but I don't know what this mean. I can't find any information about this. Please Help. Thank you

When drawing a floor plan for planning AP placement, what is the best practice for dealing with split level spaces? Where there is a main floor, then one floor half a level down, and a second floor half a level up.

When drawing a floor plan for planning AP placement, what is the best practice for dealing with split level spaces? Where there is a main floor, then one floor half a level down, and a second floor half a level up.

GTM-P2G8KFN