replacing the whole stack (5 x summit x440 24&48P) with new same model node with higher sw images. i need the procedure on how to do it!
due to allegedly batch defect, we will replace the previously deployed switch with new coming from new batch. please share the step on how to replace the whole stack with minimum downtime.